Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

FBY-55 Sheathed Electric Heater (Thermal Oil Electric Heater Equipment)

Published: 2026-10-11

产品价格:0.00

Views: 2922

Category: Sheath Heater

Product Description

Terminal Overheating: Check Contact Resistance First

During on-site operation, terminal heating and insulation discoloration inside the junction box of sheathed electric heaters are common phenomena. During maintenance, first disconnect the power, use a feeler gauge to check whether the terminal crimping is loose, and use a micro-ohmmeter to measure the contact resistance. If it is significantly higher than the factory value, re-crimp or replace the terminal. Avoid direct copper-aluminum connections to prevent electrochemical corrosion from increasing contact resistance.

Medium Temperature and Surface Load Must Correspond

During operation, attention should be paid to the matching of surface load and medium temperature. This type of heater has a rated voltage of 220V or 380V, a power range of 1–15kW, and a recommended surface load not exceeding 4W/cm². After the temperature of media such as thermal oil rises, viscosity changes and the heat transfer coefficient decreases. If the surface load is too high, the outer wall temperature of the sheath may exceed the allowable value of the medium, causing coking or oil deterioration.

Regularly Measure Insulation Resistance

Use a 500V megohmmeter every month to measure the cold insulation resistance of the heater; the reading should not be lower than 1MΩ. If it is lower than this value, check whether the junction box is damp or the sheath is damaged. In humid environments, moisture-proof heating tape may be added or sealing improved, but power must not be forcibly supplied.

Sheath Surface Cleaning and Fastening Inspection

During quarterly shutdowns, remove carbon deposits and oil scale from the sheath surface to avoid local overheating. At the same time, check the flange or threaded connections for leakage and whether fasteners are loose. When replacing, pay attention to the coaxiality between the heater and the pipeline to prevent the sheath from deforming under mechanical stress.

Start-Stop Sequence and Interlock Protection

When starting, first turn on the circulation pump and confirm medium flow before energizing; when stopping, first cut off the heating power, and stop the pump only after the medium temperature drops to a safe range. Overtemperature interlock and low-flow protection should be provided to avoid dry burning. If frequent tripping occurs, first investigate whether overtemperature is caused by insufficient flow.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us