Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

DJR-450 Bolt Electric Heating Rod

Published: 2026-10-07

产品价格:0.00

Views: 2922

Category: Bolt Heater

Product Description

Insulation Resistance and Withstand Voltage Test

Before installation, use a 500V megohmmeter to measure the insulation resistance between the lead wire of the heating rod and the metal shell. The cold-state value is recommended to be no less than 50MΩ. If it is lower than this value, check the end seal or perform drying treatment. The withstand voltage test is conducted at 1500V/50Hz for 1 minute; no breakdown or flashover is considered qualified.

Voltage Regulation and Operating Specifications

When regulating voltage with the matching control cabinet, the voltage should be gradually increased from the minimum value to the working value, and operation should begin only after the ammeter changes smoothly. The WQJ low-voltage control cabinet must not switch voltage gears under load. The main circuit must be cut off first, and after the indicator light goes out, the gear can be changed to avoid arc damage to the contacts.

Installation and Tightening Torque

When the heating rod is inserted into the center hole of the bolt, the fit clearance should be controlled between 0.2mm and 0.5mm. Too large a clearance affects heat transfer efficiency, while too small a clearance makes disassembly and assembly difficult. When tightening, tighten in diagonal sequence in stages. Refer to the bolt specifications for torque values: approximately 450N·m for M36 and approximately 800N·m for M48, to avoid bending of the rod body caused by one-sided overload.

Operating Temperature and Power Matching

The DJR-450 type commonly has a power of 1.5kW to 6kW, and the surface load is recommended not to exceed 3.5W/cm². When heating large bolts, the temperature rise rate should be controlled within 5℃/min to prevent local overheating. If used for heating water tanks or oil tanks, the power must be calculated according to the volume and heating requirements to avoid long-term overtemperature operation.

Storage and Regular Inspection

Uninstalled heating rods should be stored in a dry and ventilated place to prevent the insulation layer from becoming damp. Check quarterly whether the terminal blocks are loose or oxidized, and measure changes in insulation resistance. If cracks or deformation are found on the shell, stop using it and replace it.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us