Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

HDX-680 Hot and Cold Heat Exchanger

Published: 2026-10-21

产品价格:0.00

Views: 2922

Category: 冷热换热器

Product Description

After one quarter of operation, the temperature difference on the cooling water side gradually increased, and inspection upon opening revealed scale attached between the plates—a situation commonly reported by on-site maintenance personnel. The daily maintenance focus of a hot and cold heat exchanger often lies not in the equipment itself, but in the state changes on the medium side.

Point 1: Pay attention to the scaling tendency on the cooling water side

When the cooling water has high hardness, the heat exchange surface is prone to gradual scaling, manifested as outlet temperature deviating from the set value and system pressure difference rising. During maintenance, regular inspections can be carried out in conjunction with water quality reports, and chemical cleaning or installation of filtration devices can be arranged when necessary. Avoid using chemicals that cause swelling of the sealing gaskets during cleaning, and after cleaning, retighten the clamping bolts to the specified dimension.

Point 2: Verify the operating boundaries of pressure and temperature

The equipment operating pressure should always remain within the rated range on the nameplate, and the heating and cooling processes should not be too rapid, to avoid premature aging of plates and gaskets due to repeated expansion and contraction from thermal stress. During patrol inspection, watch for signs of leakage at flanges and connections, replace gaskets promptly if hardening or deformation is found, and record the impact of medium temperature changes on the service life of seals.

Point 3: Arrange inspection cycles according to medium characteristics

When the medium contains chloride ions or has a certain corrosiveness, the plate material and gasket material must match the working conditions. Maintenance personnel can shorten the first inspection interval based on medium corrosiveness, chloride ion content, and operating temperature range, and then adjust the cycle after accumulating operating data.

Point 4: Pay attention to installation space and maintenance access

Sufficient lateral space is required for pulling out plates for cleaning or replacement. If on-site space is limited, lifting and disassembly plans should be arranged in advance in the shutdown maintenance plan to avoid temporary operations affecting system recovery time.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us