Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Maintenance and Precautions for JRH-380 Jacket Electric Heater

Published: 2026-10-18

产品价格:0.00

Views: 2922

Category: Sheath Heater

Product Description

Local scorch marks on the jacket surface or darkening of the oil color during equipment operation are often related to surface load control and the flow state of the medium. Regarding the maintenance points of concern to technical engineers, the following is presented in a Q&A format.

Q: Which parts should be focused on during daily inspections?

A: Focus on checking the sealing condition of the wiring cavity, whether there is carbon deposit or scaling on the jacket surface, and whether fasteners are loose. For explosion-proof types, confirm that the flameproof surface is intact and the protection rating is maintained at IP54 or above. It is recommended to record the insulation resistance once a month; when it is below 1MΩ, shut down the equipment for troubleshooting.

Q: Does replacing the heating core require draining the oil tank?

A: The jacket-type structure supports core replacement without draining the medium. Before operation, cut off the power and wait for the jacket to cool below 50°C, then loosen the junction box and pull out the core. After replacement, check the cold-state insulation according to JB/T 12233-2015, and slowly raise the temperature to the working temperature to observe whether the current is stable.

Q: How should the surface load be controlled for oil media?

A: For oil heating, it is recommended to control the surface power density at 1~3W/cm² to avoid carbonization caused by local overheating. For corrosive media, 316L or titanium alloy jackets should be selected, and the wall thickness should be checked regularly. Under high-temperature conditions, the thermal expansion allowance of the jacket must be calculated to prevent stress concentration at the flange connection.

Q: What should be noted when restarting after long-term shutdown?

A: If shut down for more than three months, measure the insulation resistance to confirm the moisture condition; check the wiring terminals for oxidation; carry out the first heating in stages, stabilizing for 30 minutes at each stage, and observe the deviation between the temperature controller and the actual measurement. If the medium contains water, first circulate at low speed to remove the water before energizing.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us