Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

ZDR-560 Hot and Cold Heat Exchanger

Published: 2026-10-17

产品价格:0.00

Views: 2922

Category: 冷热换热器

Product Description

How Do Heat Exchange Media and Materials Affect Maintenance Cycles?

In on-site operations and maintenance, the maintenance frequency of hot and cold heat exchangers often depends on medium compatibility. The ZDR-560 hot and cold heat exchanger commonly uses materials such as carbon steel, stainless steel, and duplex steel, and different media need to be matched with corresponding materials. For example, media containing chloride ions should not use ordinary stainless steel, otherwise stress corrosion is likely to occur. O&M personnel should regularly verify the medium composition and material certificates, and inspect the heat exchange surface for scaling and corrosion every 3 to 6 months. If the medium contains particulate matter, it is recommended to shorten the inspection interval.

Differences in Daily Inspections Between Cast Aluminum and Cast Copper Heat Exchangers

This model offers two heat exchange body options: cast aluminum and cast copper. Cast aluminum heat exchangers are suitable for medium- and low-temperature uniform heating applications such as plastic machinery, die heads, and water heaters, with relatively lower cost; during inspection, focus on surface oxidation and fin deformation. Cast copper heat exchangers have better thermal conductivity and high mechanical strength, and are often used in chemical pipelines, alloy die-casting machines, and molds with higher requirements; during inspection, pay attention to loosening of connecting threads and electrochemical corrosion. Both should be cleaned of accumulated dust during shutdown to maintain smooth ventilation.

Maintenance Points for Seals and Connections

Seal failure is a common source of faults. Flanges, threads, and welded joints should be inspected quarterly, and if leakage is found, tighten or replace the seals promptly. For detachable structures, when reassembling, force should be applied evenly in a diagonal sequence to avoid excessive local stress. If the medium temperature fluctuates frequently, it is recommended to shorten the seal replacement cycle.

Operating Parameter Records and Abnormality Judgment

It is recommended to record inlet and outlet temperatures, pressures, and flow rates daily. When heat exchange efficiency drops significantly, first check for scaling and air blockage, then check whether the internal flow channels are blocked. Operation under overpressure or overtemperature is strictly prohibited, and safety valves and pressure gauges need regular calibration. If vibration or abnormal noise is found, stop the machine immediately for inspection.

Spare Parts and Technical Support

Procurement decision reference: choose a supplier with comprehensive after-sales and technical support, and obtain factory inspection reports and material certificates. Daily spare parts should include gaskets, fasteners, and commonly used instruments. O&M personnel should keep operation manuals and assembly drawings for quick reference during faults.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us