Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

BR-80 Plate-and-Frame Heat Exchanger

Published: 2026-10-16

产品价格:0.00

Views: 2922

Category: 板框式换热器

Product Description

When leakage occurs at the plate sealing area during on-site operation and maintenance, is shutdown for major overhaul the only option? First check whether the clamping dimension is up to standard and whether the bolts are loose. Many leakage problems can be solved by retightening. The following is a checklist of key points for routine maintenance, for on-site operation reference.

Daily Monitoring of Pressure Difference and Flow Velocity

During operation, the inlet and outlet pressure difference and flow velocity should be controlled to avoid overpressure and severe temperature shocks. An increase in pressure difference usually means fouling or blockage in the channels between plates, and it should be recorded promptly and cleaning arranged. Too low a flow velocity tends to aggravate scaling, while too high a velocity may erode the edges of the sealing gaskets. It is recommended to record the pressure difference reading once per shift, and arrange an inspection when it exceeds 20% of the initial value.

Material Matching of Plates and Sealing Gaskets

Plates are commonly made of 304 or 316L stainless steel; titanium is suitable for seawater or chlorine-containing media, and Hastelloy is used for highly corrosive conditions. Sealing gaskets are often selected from nitrile rubber, EPDM rubber, or fluororubber, and must match the medium temperature and chemical compatibility. When replacing gaskets, be sure to confirm the material code to avoid mixing them up.

Bolt Loosening Sequence During Disassembly and Inspection

During disassembly and inspection, bolts should be loosened evenly in a diagonal sequence to prevent plate deformation. It is strictly forbidden to loosen one side all the way down in one go. Each loosening amount should not exceed one third of the bolt travel, and the operation should be repeated until fully loosened. During reassembly, tighten gradually and evenly in the same sequence, and refer to the value marked on the nameplate for the final clamping dimension.

Temperature Difference Control During Shutdown and Restart

If the medium needs to be drained after shutdown, wait until the equipment temperature drops close to ambient temperature before doing so, to avoid uneven shrinkage of plates or gaskets caused by rapid cooling. During restart, first increase temperature and pressure slowly; the recommended rate of temperature change should not exceed 30°C per minute.

Spare Parts Storage and Records

Spare plates and gaskets should be placed flat in a cool, dry place, avoiding heavy pressure and direct sunlight. After each maintenance, record the clamping dimension, the batch of replaced parts, and changes in operating pressure difference, so as to facilitate traceability and predict the next maintenance cycle.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us