Desktop|中文
Home About Us
Products +
Company News Industry Trends Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

GLB-200 Shell and Tube Heat Exchanger

Published: 2026-10-05

产品价格:0.00

Views: 2922

Category: 管壳式交换器

Product Description

The GLB-200 shell and tube heat exchanger is suitable for steam-water, water-water, and other heat exchange conditions. The following Q&A is based on on-site operation and maintenance experience.

Q1: Which parts should be focused on during daily inspections?

Check the shell for leakage, whether the flange connections are tight, and whether there is abnormal displacement of the supports. Observe the pressure gauge and thermometer readings. If the pressure difference between inlet and outlet increases by more than 0.05 MPa compared with the initial value, cleaning should be arranged. Record the secondary-side outlet temperature once a week. If the deviation exceeds ±5°C from the design value, the cause must be investigated.

Q2: Why should floating-head or U-tube structures with expansion joints be selected when the temperature difference is large?

When the metal wall temperature difference between the tube side and shell side exceeds the allowable range of the material, a fixed tubesheet structure will generate relatively large thermal stress. In this case, a floating-head or U-tube structure with expansion joints should be selected to absorb the thermal expansion difference. The GLB-200 shell and tube heat exchanger can use a fixed tubesheet under working conditions with a temperature difference of ≤50°C; when it exceeds this, the selection should be adjusted according to the above principle. During operation and maintenance, if cracks are found in the tubesheet welds, it is necessary to recheck whether the actual temperature difference has exceeded the limit.

Q3: How is the cleaning cycle determined?

According to the fouling coefficient of the medium, it is generally inspected every 3 to 6 months. If the pressure drop increases by 15% or the heat transfer coefficient decreases by 20%, cleaning should be carried out. During cleaning, avoid using high-concentration acid solutions to prevent corrosion of the tube bundle.

Q4: How should maintenance be carried out during shutdown?

Drain the internal medium, fill with dry nitrogen for protection, or use full-water maintenance and regularly test the water quality. Apply anti-rust grease to the flange sealing surfaces.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us